Indian Railway

https://s3-ap-southeast-1.amazonaws.com/localcircles-s/img/localcircles_b_logo.jpg 0 000
non availability of over bridge from plate form no 3 towards NTPC Colony.
2.08 / 5 12 Reviews
Railway Station Road
Unchahar
Unchahar Railway Station
2.0812
2.08
BSNL and MSEB to start for Under Ground Cabelling. BSNL to Laid OFC Cable and MSEB to laid HT cable both Under Ground.

------- Edited on 2017-02-20 -------

The need of Internal Roads of Layouts,Societies and Colones are needed with good Quality of Construction keeping in view of Drainage Lines and Corporation Water System ( Maintenance without damaging these Roads with Proper Speed Rattlers (Not to damage the Vehicals but to low down the Required Speed).
very bad
SURAT STATION very badly managed. NOT FAULT of officers. INFRASTRUCTURE shortfall.
VERY BAD PRACTICE IS GOING ON IN TDR (FILED FOR PASSENGER NOT VISITED) PROCESSING FOR DHAULI SUPERFAST EXPRESS. EVEN EF TDR FILE MUCH BEFORE TRAIN STARTS FROM STARTING POINT OF THE TRAIN THE AUTHORITY SO MOTTO MARKED THE SEAT AS PASSENGER VISITED AND NO REFUND PROCESSED. WITHOUT PASSENGER ACTUALLY TRAVELED HOW THE TICKET IS CHECKED VISITED . THAT ATTRACTS VERY BAD IMAGE N MAY ATTRACTS LEGAL ACTION.

Related Ratings

Share To
Enter your email and mobile number and we will send you the instructions

Note - The email can sometime gets delivered to the spam folder, so the instruction will be send to your mobile as well

All My Circles
Invite to
(Maximum 500 email ids allowed.)