My experience with the Railways

I am Uma Ghurka, Managing Director , Thermocables Ltd ;Tech Director, Thermopads Pvt Ltd ; Director, Thermosystems Pvt Ltd ; Co-founder of the Thermogroup, an Electrical Engg from IIT Madras of the 1975 batch,National President, Confederation of Women Entrepreneurs.

It all began with my company - Thermo Cables application for Vendor Approval with RDSO, Lucknow being rejected, on the most unreasonable grounds, and yet totally inline with the guideline laid out in the Standard Technical Requirements. However, on a deeper study of the guidelines we recognised this apparent contradiction was due to an ambiguity in the document. This fact was represented at the highest levels, both at RDSO, Lucknow and the Railway Board, Delhi. It is most heartening to see the genuine interest in the authorities to ensure fair play with Vendors. The effort and speed at which they worked, the depth to which they studied and scrutinized the case is amazing. This led to the RDSO amending the ISO guidelines bringing in clarity and thereby ensuring they open doors to more genuine and capable vendors, which is a win-win for both Railways and Suppliers.

I sincerely thank the Chairman of Railways, the Director (Efficiency & Research), the Director General, RDSO for being sensitive to their vendors and supporting them.

As we worked with the Railways, we learnt from the Chairman, Mr. Ashwani Lohani’s staff that he works 12 X 7 (9AM – 9PM – 7Days X 52 Weeks – not a holiday). When asked how do they cope up with his work, they say they work in shifts.

Hats off to such officers who work hard and listen and bring a new way of working at Railways, surely a sign of achhe din! more  

View all 44 comments Below 44 comments
Railway working on better way but there is a major problem of punctuality of trains. Maximum trains are running late. Many trains are running late 8 to 10 hrs everyday. I hope railway will work on it. If trains are late after 3 hrs. The Govt. will give some concessions to the passengers. more  
Absolutely correct every individual railways employee should consider themselves as an employee who is bound for 8 hrs duty only instead he/she should serve hi/her duty with full integrity/sincerity/punctuality and responsibility. Because one mistake doesn't matter minor/major can have catastrophic effect with respect to life and government assets. more  
This action of railway is simply disgusting. It seems present officers who are responsible for scrutiny for subsequent approval suffered with inferiority complex during scrutinizing your proposal. more  
On Fri, May 25, 2018 at 6:57 AM, Uma Ghurka wrote: > more  
Every department shall take them as role models. more  
Post a Comment

Related Posts

    • Stop the irritating announcements on vande bharath

      Have been travelling frequently on the vande bharath trains to Tamilnadu from Bangalore. The announcements are just outright irritating, reading the English translations (literally, matra by maatra...

      By Padmanabhan G
      /
    • WHY DO LOWER BERTHS IN SLEEPERS ELUDE GENUINE SEEKERS ?

      A recent query on Twitter highlighted a common frustration: “Despite booking tickets for three senior citizens with a preference for all lower berths, they were assigned a middle berth, an up...

      By Jayakumar Daniel
      /
    • : INTRODUCTION OF A/C SUBURBAN TRAINS IN THE CITY – A WELCOME MOVE :

      The introduction of air-conditioned suburban trains in the city is a most welcome development. * A heartfelt thank you to the engineers at Integral Coach Factory (ICF) for their innovati...

      By Jayakumar Daniel
      /
    • IRCTC ONLINE TICKETING: NEW FEATURES – HELP NEEDED. :

      We’ve recently noticed some new features on the IRCTC ticketing screen that are quite puzzling. One such feature is "Introducing Trip Guarantee", which states: Get 3x the refund amount if you...

      By Jayakumar Daniel
      /
    • IRCTC website at 10 am

      Railway Minister Should Try Using IRCTC Website Once For Booking Tatkal Train Tickets That Website/App Doesn’t Work at 10 AM All Tickets Mostly Gone By The Time You Logi...

      By Vibhor Chhabra
      /
    • TEJAS, VANDE BHARAT EXPRESS: A JOURNEY TO REMEMBER and DEVEOP BETTER :

      After a long time, I had the opportunity to travel with the Indian Railways (IR), having regained good health. Interestingly, I ended up traveling on premium trains—the Vande Bharat and Tejas...

      By Jayakumar Daniel
      /
    • Wait listed tickets

      It will be better to stop issuing wait listed tickets. Only confirmed and RAC tickets. Passengers take wating list ticket and sit in reserved coaches forcefully in groups. RAC should...

      By Satyapal Singh
      /
    • Prioritise Wait List Passengers For Confirmed Tatkal Tickets

      Indian Railways should give first right of refusal to Wait List Passengers to Convert WL Tkts To Confirmed Tatakal Tkts. This can be done by sending an SMS and Email asking for confirmation and pay...

      By Santosh Ramanand
      /
    • Utility

      Recently I traveled Tirupati to Mayiladuthurai; then Chennai; then to Hyderabad. I have Railway utility Brought up Excellent. Food supplier through train quality become good; Outside supplier also ...

      By Kv Venkata Chalam
      /
    • IRCTC: REVOLUTIONIZING RAIL TRAVEL IN INDIA :

      The Indian Railway Catering and Tourism Corporation (IRCTC) has transformed rail travel for the common man in India. Its online ticket booking system, launched in August 2002, is a technological bo...

      By Jayakumar Daniel
      /
    • IRCTC must do better

      IRCTC’s Market Cap is Around ₹64,000 Crore Takes ₹20/30 Convenience Fee for Booking Cancellation Charges (₹60/Upto 50% of Ticket) Still App Crashes Often, Fai...

      By Naina Mittal
      /
Share
Enter your email and mobile number and we will send you the instructions

Note - The email can sometime gets delivered to the spam folder, so the instruction will be send to your mobile as well

All My Circles
Invite to
(Maximum 500 email ids allowed.)